Celebration of the official launch of the Francis Container Power Solution in Shakimardan
On 11th July President of Uzbekistan, President Mirziyoyev, visited the Fergana region to participate in the “Ceremony dedicated to launching the construction of new projects in industry, energy and chemical fields in Fergana region”.
One of these new projects is the small hydropower plant at the Shakimardan river with the Francis Container Power Solution from GHE with a capacity of 2.2 Megawatt.
The ceremony itself took place in Fergana but a live video has been shown from two different small hydropower demo-sites, one is from the Hydro4U demo-site at the Shakimardan Village.
The head of the construction department at UGE, Mr Said Yusupov, announced that the Shakimardan HPP is ready for operation.
Hydro4U partners have contributed to this demonstration site with preparational work, technical design, ecological studies and the HPP Francis Container Power Solution and support on site.
An overview of the implemented technology is given on the website under: Demo 1 – Container Solution – Hydro4U and an overview of the construction sites is explained on this poster .
Further information:
Video about two small HPP from UGE out of which the one in Shakimardan Village is the one being the Hydro4U demo-site at the Shakimardan River: Official Launch of the Francis Container Power Solution in Shakimardan
Read more about the ceremony that took place on the 11th July 2024: Мирзиёев запустил строительство первой системы хранения электроэнергии (kun.uz)
Picture credits: UGE